Process Design Request Form
Contact Information
* Required information
*Contact Person
*Organization
Position/Title
Address
City State/Province Zip
Country
*Telephone Fax
Email
Project Information
Facility Name
Address
City State/Province Zip
Country
*Project Type
Brentwood Privacy Policy
Wastewater Process Design Request (page 2 of 3)
Wastewater Characteristics
Source of Wastewater
Design Averge Daily Flow
(specify mgd or m3 per day)
Maximum Monthly Flow
(specify mgd or m3 per day)
  Influent Desired Effluent
BOD Total (mg/l)
BOD Soluble (mg/l)

COD Total (mg/l)

COD Soluble (mg/l)

Suspended Solids (mg/l)

TKN (mg/l)

Ammonia-N (mg/l)

Temperature (max/min)

pH

Alkalinity (mg/l as CaCO3)
Influent is
Effluent is
* Treatment System
Brentwood Privacy Policy
Water Process Design Request (page 2 of 2)
Water Characteristics
Source of Water
Total Daily Flow
(specify mgd or m3 per day)
Average Daily Flow
(specify mgd or m3 per day)
Average
Raw Water Turbidity
Flocculants or
Coagulants Used
Chlorine Added
Prior to Clarification
Process Information
Current and proposed process flow chart description
with details of
each treatment step would be helpul

Number of Sedimentation
Basins/Clarifiers
Flow Rate Per Basin
If Tank is Rectangular:
Width
Length
Depth
Is there a sludge collection mechanism that
would prohibit the use of tube settler
support columns placed on the basin floor?
Do you have a preferred plan view area
for the tube settlers?
If Tank is Circular:
Tank Diameter
Centerwell Diameter
Outside Wall Depth
Existing
Tube settlers
Tube Settler Area
Existing
Troughs & Weirs
Troughs per basin
Preferred
Support System
Brentwood Privacy Policy
Trickling Filters (page 3 of 3)
Process Information
Filter Status
Process Type
Number of Filters
Diameter
Depth
Media Type
Current and proposed process flow chart description with details of each treatment step would be helpul
Additional Information
Ventilation
Support Type
Support Width
Support Spacing
Wastewater Distributor
Other
considerations (including site restrictions,
purpose of
project, etc.)
Brentwood Privacy Policy
Fixed Film in Activated Sludge (page 3 of 3)
Process Information
Activated Sludge System Status
Reason for IFAS Installation
Number of Aeration Trains
Number of Aeration Basins per Train
Dimensions Length Width Depth
Tank Configuration
Food/Micro-organism Ratio
(F/M )
Current Proposed
Solids Retention Time
(SRT) days
Current Proposed
Mixed Liquor Suspended Solids (MLSS) mg/l Current Proposed
Aeration Type
Current and proposed process flow chart description with details of each treatment step would be helpul
Other considerations (including site restrictions, purpose of project, etc.)
Brentwood Privacy Policy
Modular Wastewater Treatment (page 3 of 3)
Process Information
Existing Infrastructure or Equipment
Future Expansion Needs/
Future Regulatory Requirements
Brentwood Privacy Policy