Process Design Request Form
Contact Information
* Required information
*
Contact Person
*
Organization
Position/Title
Address
City
State/Province
Zip
Country
*
Telephone
Fax
Email
Project Information
Facility Name
Address
City
State/Province
Zip
Country
*
Project Type
Existing
Retrofit
Upgrade
New Facility
Wastewater Treatment
Water Treatment
Brentwood Privacy Policy
Wastewater Process Design Request (page 2 of 3)
Wastewater Characteristics
Source of Wastewater
Domestic Sewage
Brewery
Chemical
Dairy
Fermentation
Food Processing
Pharmaceutical
Other (specify)
Design Averge Daily Flow
(specify mgd or m3 per day)
Maximum Monthly Flow
(specify mgd or m3 per day)
Influent
Desired Effluent
BOD Total (mg/l)
BOD Soluble (mg/l)
COD Total (mg/l)
COD Soluble (mg/l)
Suspended Solids (mg/l)
TKN (mg/l)
Ammonia-N (mg/l)
Temperature (max/min)
pH
Alkalinity (mg/l as CaCO3)
Influent is
Raw Wastewater
Primary Clarifier Effluent
Secondary Treatment Effluent
Effluent is
from Trickling Filter
from Secondary Clarifier
Final Effluent
*
Treatment System
Trickling Filters
Fixed Film in Activated Sludge
Modular Wastewater Treatment
Brentwood Privacy Policy
Water Process Design Request (page 2 of 2)
Water Characteristics
Source of Water
Groundwater
River
Lake
Recycled Wastewater
Other (specify)
Total Daily Flow
(specify mgd or m3 per day)
Average Daily Flow
(specify mgd or m3 per day)
Average
Raw Water Turbidity
Flocculants or
Coagulants Used
Yes
No
Don't Know
Chlorine Added
Prior to Clarification
Yes
No
Don't Know
Process Information
Current and proposed process flow chart description
with details of
each treatment step would be helpul
Number of Sedimentation
Basins/Clarifiers
Flow Rate Per Basin
If Tank is Rectangular:
Width
Length
Depth
Is there a sludge collection mechanism that
would prohibit the use of tube settler
support columns placed on the basin floor?
Yes
No
Don't Know
Do you have a preferred plan view area
for the tube settlers?
Yes
No
If Tank is Circular:
Tank Diameter
Centerwell Diameter
Outside Wall Depth
Existing
Tube settlers
Crossflow
2 ft. Tubes
3 ft. Tubes
4 ft. Tubes
Shallow Angled
None
Other (specify)
Tube Settler Area
Existing
Troughs & Weirs
FRP V-Notch Weirs
SS V-Notch Weirs
Straight Edge Weirs
Pipe with Orifices
Other (specify)
None
Troughs per basin
Preferred
Support System
Epoxy-coated Carbon Steel
Aluminum
Type 304 Stainless Steel
Type 316 Stainless Steel
Fiberglass
Other
No Preference
Brentwood Privacy Policy
Trickling Filters (page 3 of 3)
Process Information
Filter Status
Existing
Proposed
Other (specify)
Process Type
Roughing Tower
Seconday Treatment
Nitrification
Other
Number of Filters
Diameter
Depth
Media Type
CFS-3000 Cross Flow Media
CF-1900 Cross Flow Media
CF-1200 Cross Flow Media
VF-5000 Vertical Flow Media
VF-3800 Vertical Flow Media
Mixed 3000/5000
Mixed 1900/3800
Rock
Random
Wood
Crossflow
Vertical Flow
Don't Know
Other (specify)
Current and proposed process flow chart description with details of each treatment step would be helpul
Additional Information
Ventilation
Fans
Natural Draft
Other (specify)
Support Type
AccuPier Support System
Concrete Blocks
Clay Tile
Concrete Beams
FRP Grating
Don't Know
Other (specify)
Support Width
Support Spacing
Wastewater Distributor
Other
considerations (including site restrictions,
purpose of
project, etc.)
Brentwood Privacy Policy
Fixed Film in Activated Sludge (page 3 of 3)
Process Information
Activated Sludge System Status
Existing
Proposed
Other (specify)
Reason for IFAS Installation
Reduce Clarifier Load
Increase Treatment Capacity
Nitrification
Denitrification
Other (specify)
Number of Aeration Trains
Number of Aeration Basins per Train
Dimensions
Length
Width
Depth
Tank Configuration
Complete Mix
Plug Flow
Other (specify)
Food/Micro-organism Ratio
(F/M )
Current
Proposed
Solids Retention Time
(SRT) days
Current
Proposed
Mixed Liquor Suspended Solids (MLSS) mg/l
Current
Proposed
Aeration Type
Fine Bubble
Coarse Bubble
Mechanical
Other (specify)
Current and proposed process flow chart description with details of each treatment step would be helpul
Other considerations (including site restrictions, purpose of project, etc.)
Brentwood Privacy Policy
Modular Wastewater Treatment (page 3 of 3)
Process Information
Existing Infrastructure or Equipment
Future Expansion Needs/
Future Regulatory Requirements
Brentwood Privacy Policy